(영문) 대구지방법원 2014.02.18 2013가합201466
채무부존재확인
Text

1. With respect to the 37 tools project of the Nakdongdong River project, the defendant Republic of Korea recovered and notified the plaintiff.

Reasons

(3) If it is possible to find it possible to modify a bill of lading accurately compared with design drawings, etc. at the time of tender - new item: contract unit price - quantity calculated at the time of design modification - where it is difficult to predict that the modification of a bill of lading can be made with design drawings, etc. at the time of tender - the delivery at the time of tender - such as disagreements between drawings, and bill of materials: The increased quantity: unit price at the time of design modification x consultation rate - new item: consultation rate at the time of design modification x consultation rate x consultation rate at the time of design modification x consultation rate). If the increase increases due to the settlement of the volume ordinarily generated at the scene of civil works - new item - if the request for the modification of a bill of materials was made at the time of design change at the time of tender - consultation rate at the time of design change x new item - new item - consultation rate at the time of consultation x consultation rate x consultation rate x agreement rate among the heads of the Regional Construction and Management Administration in Busan project sites.

(Nos. 43 1, 2, 57).

arrow