logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 대구지방법원 2014.02.18 2013가합4245
채무부존재확인
Text

1. All of the claims in this case shall be dismissed.

2. A project of tools (Gumi-gu) 28 tools (Gumi-gu) for the Nakdong River;

Reasons

(3) If it is possible to find it possible to modify a bill of lading accurately compared with design drawings, etc. at the time of tender - new item: the increased quantity: the contract unit price - the amount calculated at the time of tender - the amount to be issued at the time of tender - the amount to be perused, such as disagreements between drawings and bill of materials, etc. - the increased quantity: the increased quantity: the unit price at the time of design change x the consultation rate - new item: the rate of consultation x the consultation rate at the time of design change x the consultation rate) the settlement of the amount ordinarily generated at the scene of civil works - the increased quantity: the increased quantity: the new cost of contract - the increased quantity at the time of design change - (3) the consultation rate at the time of design change x the new cost of construction - the consultation rate x the consultation rate x the consultation rate x the number of new cost of construction 2. The increase or decrease in the total project cost by the head of the Regional Construction and Management Administration within 30-month Construction and Management Guidelines, etc.

arrow