logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 대전지방법원 홍성지원 2018.09.13 2018가합104
손해배상(국)
Text

1. The Defendants jointly do so to the Plaintiff A, KRW 285,327,960, and KRW 10,000,000 to the Plaintiff B, and KRW 5,000 to the Plaintiff C, D, and E, respectively.

Reasons

1. Basic facts

A. Plaintiff B is the husband of Plaintiff A, Plaintiff D and E are children of Plaintiff A, and Plaintiff C is the mother of Plaintiff A.

B. On June 27, 2016, around 21:30 on June 27, 2016, Plaintiff A walked at the edge of the end of the H in the vicinity of the Chungcheongnam-gun G G G neighboring budget branch of Plaintiff House, which fell below the riverside of approximately 3.2 meters high in height of 3.2 meters due to a crepans that did not install a drum for the construction of agricultural water pipes and local waterworks pipes.

(2) On June 28, 2016, Plaintiff A lost a mind immediately after the instant accident (hereinafter “instant accident”). On June 28, 2016, the following day, Plaintiff A was found and transferred to the hospital due to the discovery of the light number of the light, which requires treatment for about 32 weeks of the instant accident, and caused injury, such as damage to the number of the parallels, streaking streaking streaking streaking streaking streaking streaking streaking streaking, close strekeing streaking streaking streaking streaking, and strekeing streaking streaking streaking streaking streaking streaking streaking streaking streaking streaking streaking streaking streaking.

The plaintiff is currently receiving rehabilitation treatment due to reflectrs, paralysis, etc., and most of them are unable to independently perform basic action in daily life, such as walking or seeing the opposite side, and thus it is necessary to help others.

C. On April 28, 2014, Defendant F Co., Ltd. (hereinafter “Defendant F”) was awarded a contract for the basic expansion of the “J Rearrangement Project” with respect to the road maintenance, multi-purpose square, river protection, maintenance, etc. with respect to the roads and rivers (I) adjacent to the Chungcheongnam-gun budget-gun G where the instant accident occurred from the Defendant F Co., Ltd. (hereinafter “Defendant F”).

(hereinafter “instant construction”) D.

Plaintiff

A A on November 21, 2016, filed a complaint with Defendant F (K at the time of the representative director), L, Budget Office M, N, andO with the Chungcheong Budget Police Station. However, the Chungcheongnam Budget Police Station filed the complaint with the said Defendant on December 29, 2016.

arrow