logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 부산지방법원 2013.06.21 2013고정1528
업무방해등
Text

Defendants shall be punished by a fine of KRW 300,000.

The Defendants did not pay each of the above fines.

Reasons

Punishment of the crime

Defendants live in Young-gu, Busan Metropolitan City D apartment.

1. On December 7, 2010, Defendant A conspired with E, F, G, and name-free residents, and obstructed the work of the Section 3 Section 4 Section 7 connected to the Inter-Korean Port Inter-Korean Port Inter-Korean Port 141-7, Busan, Young-do Inter-Korean Port 141-97, in the construction site of the Section 3 construction site, and the victim SPC Co., Ltd., in order to prevent the installation of temporary fences at this site. G, F, together with the non-name-free residents, the Defendant A was unable to perform the work by preventing the construction from going to the front of the construction site, and Defendant A interfered with the work of the Section 3 Section 3 Section 3 Section 7 connected to the Inter-Korean Port 3 Section 3 Section 3 by force.

2. On January 11, 2011, Defendant A conspiredd with F and non-resident residents on his name, and interfered with the work of Section 3 Section 4, Section 3, Section 3, Section 4, Section 4, Section 4, Section 4, Section 4, Section 4, Section 4, Section 4, Section 4, Section 4, Section 4, Section 1, Section 4, Section 4, Section 4, Section 4, Section 4, Section 4, Section 4, Section 4, Section 4, Section 4, Section 4, Section 4, Section 4, Section 4, Section 4, Section 1, Section 4, Section 4, Section 1, Section 4, Section 1, Section 4, Section 1, Section 2, Section 2, Section 4, Section 4, Section 2, Section 3, Section 3, Section 3, Section 3, Section 3, Section 3, Section

3. On January 11, 2011, Defendant A, in collusion with residents in unsound name, attempted to install temporary soundproof walls, etc. at the construction site of Section 1 in front of the North and South-North Korean port fire station located in Busan Young-gu, Busan, from January 11, 201 to January 17:00, and at the construction site of Section 1 with the North and South-North Korean port connections, and at the victim S rink Construction Co., Ltd., the Defendant A’s construction project.

arrow