Text
1. The Defendants jointly share KRW 242,245,736 with respect to the Plaintiff, and the period from February 10, 2017 to December 5, 2018.
Reasons
1. Facts of recognition;
A. Defendant C Co., Ltd. (hereinafter referred to as “Defendant Co., Ltd.”) is a company engaged in the business of manufacturing high iron compression machinery, etc., and E Co., Ltd. (hereinafter referred to as “E”) is a company engaged in non-ferrous metal wholesale and retail business.
B. On October 7, 2016, the Defendant Company agreed to manufacture and install compressed metal (hereinafter referred to as “instant machinery”) with E, and completed the construction of the instant factory located in G around November 7, 2016, where the said machinery is operated by E (hereinafter referred to as “instant factory”).
C. Afterward, E started the compression work of the instant machine for Maineasium millsium, but requested repair to the Defendant Company because the instant machine does not operate properly.
Accordingly, on November 11, 2016, H and Defendant D visited the instant factory, a director who is an employee of the Defendant Company, who installed the instant machinery, and Defendant D had visited the instant factory. For the instant mechanical repair, Defendant D was engaged in the melting work that newly connects hydrotensions with hydrotensions (hereinafter “the instant folding work”).
On the other hand, E is engaged in the work of compressing the Maineium iron into the instant machine, and thus, in the instant plant, the Maineium sium sium sium scalium scalium scalium scalium scalium s
At the time of the contact work of this case, I, as the representative director of E, moved the above scke by using the scke, and J, as the employee of E, is performing the work of taking out the mascium iron in its scke, and there was a little amount of mascium dust around the machinery of this case and the scke.
E. However, there was a fire due to an accident explosiond by a Maineineium dust dust (hereinafter “the fire of this case”) that occurred during the contact work of this case, while the Maineium fire was being milked in the factory of this case.
F. I (hereinafter referred to as “the deceased”) entered the instant fire on November 22, 2016.