Text
1. The Defendant’s KRW 81,721,60 for the Plaintiff and KRW 6% per annum from February 10, 2015 to November 11, 2016, and the following.
Reasons
1. Facts of recognition;
A. On May 1, 2013, the Plaintiff entered into a contract for design and supervision (the design service contract 290,000,000,600,000, respectively) with the Defendant’s apartment-type factory (hereinafter “factory in this case”). The Plaintiff entered into a contract for design and supervision (the design service contract 290,000,000,000,000, respectively) with the Defendant’s main contents of the design service contract are as follows.
(hereinafter referred to as “design contract”). A design contract for a building
1. Title of a service contract: Construction of apartment-type factories in Cheongdo-gun;
2. The area above the Gyeong-do branch: The area outside four parcels, 150, Cheong-ri, Cheong-do, Cheong-do, Cheong-do, Cheong-do.
3. 7,452.00 square meters (2,254.22 square meters)-based 2: The number of floors for factories ( apartment-type factories) 3: The number of floors below ground, 6 stories above ground, and 6 stories above ground: steel frame and reinforced concrete structure.
4. Service contract amount: The period from the design contract date to the completion date of approval for use shall be the period from the design contract date for performing the service pursuant to Article 2 (service period) of the Subdivision Certified Architects, Inc., the owner of the building ( separate from nex 290,000,000, value-added tax) (A).
Article 3 (Scope of Services) (1) The scope of services to be provided to “A” shall be the preparation of basic design drawings, working design drawings, and other design drawings necessary for the execution of construction of multi-family housing buildings in the project application site (hereinafter referred to as “design affairs”).
1. Preparation of books approved for projects and administrative affairs incidental thereto;
2. Building design documents;
3. Mechanical equipment books; and
4. Electric installations books; and
5. Structural design documents;
6. Civil engineering design documents;
7. Preparation of an investment scheme under Article 4 (Calculation of Service Fees and Method of Payment) (1) Standards and method of calculation of service fees shall be based on remuneration standards;
Provided, That where on-site conditions and design conditions are special or duties are added, the consultation between "A" and "B" shall be determined.
(3) Payment in installments of remuneration shall be made.