logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 서울중앙지방법원 2016.11.30 2015가합572743
하자보수보증금 청구의 소
Text

1. As to the Plaintiff KRW 301,681,887 and KRW 201,00,00 among them, the Defendant shall pay to the Plaintiff KRW 100,681,87 from December 15, 2015.

Reasons

1. Basic facts

A. 1) The Plaintiff is an autonomous management body that consists of representatives of occupants for the management of 19 dong 522 households, 19 units of the apartment building, which is an aggregate building in Seongbuk-gu, Seongbuk-gu, Seoul, and 116, which is an apartment building (hereinafter “instant apartment”).

3) The Defendant is a corporation established pursuant to the Framework Act on the Construction Industry, which entered into a warranty contract for the instant apartment between Hyundai Construction and the guarantor who entered into the warranty contract for the defects. B. On March 10, 2008, Hyundai Construction and the Defendant did not perform the warranty liability arising out of the instant apartment. In the event that Hyundai Construction and the Defendant did not perform the warranty liability arising out of the instant apartment, the Defendant entered into each of the warranty warranty contracts (hereinafter “each of the warranty warranty contracts of this case”) and issued each of the warranty warranty contracts to the guaranty creditor within the scope of the period and amount specified in the table below.

The guarantee number No. 3 14867.3. 24. 24. 208. 425, 277, 8184. 41486. 24. 24. -312, 638, 909. 5 14865. 208. 312,638, 909. 208. 312,638, 909. 312, 909, 909. 2) Hyundai construction obtained approval for the use of the apartment in this case from the head of Seongbuk-gu Seoul Metropolitan Government on March 24, 2008 to March 23, 2018. Since the Plaintiff, an autonomous management organization of the apartment in this case, was not changed to the design of the apartment in this case or to the design of the apartment in this case, the part of the apartment in this case was not changed to the design of the present construction and its outer wall.

arrow