1. Of the judgment of the court of first instance, the part against the Plaintiffs, which orders the following payment to Defendant E, is lost.

Reasons

1. Basic facts

A. around May 15, 2013, Defendant E was awarded a contract for the replacement work with L for KRW 21,00,000,000 from L (hereinafter “instant building”). Around that time, Defendant E awarded a contract for the installation and dismantling work for the instant construction work to Defendant F in the first instance trial co-defendant F in KRW 3,20,000.

B. At around 07:30 on May 27, 2013, the Co-Defendant F of the first instance trial ordered three workers, including the deceased I (hereinafter “the deceased”) at the above H building. On the two-line fourths installed on the outer wall of the said building, the deceased and two other workers were designated respectively to be dismantled and the workers were removed on the ground, and the workers were removed on the ground to be dissipatedd and dissipatedd (hereinafter “the instant construction”).

C. At the time, there was a rain at the above location, and there was a rain charter, etc. installed as an steel line installed to support the string line with approximately approximately 220V-380 V flow, and there was a possibility for workers to have contact with electric wires where smoke can be damaged or leakage current flows due to aging. In order for workers including the deceased to dismantle the rain, it was anticipated that workers including the deceased should move or walk from the center of the above building to the same side. The Co-Defendant F of the first instance trial and Defendant E did not take all measures to prevent the danger of electric shock of workers at the above construction site.

around 8:00 on May 27, 2013, the Deceased was found to have died while he was performing the instant construction work with a height of 4 meters.

(hereinafter “instant accident”). The kidne, which is 175 cm away from the left side of the deceased, shows a flow trace on the boundary of the buckbucks, and the current flow was coming from the rain buck and the steering charter, which is 75 cm high from the rain bucks taken by the deceased (hereinafter “instant steering charter”).