Text
Defendants shall be punished by a fine of one million won.
Defendant
If A does not pay the above fine, 100,000.
Reasons
Punishment of the crime
Defendant
B A corporation is a corporation established on June 26, 1995 for the purpose of building construction business, etc. on the Do, Seo-gu, Seoyang-gu, Busan Metropolitan City and nine floors, and is a business owner who performed construction work on December 1, 2015 through December 31, 2016 by being awarded contract amounting to KRW 2,648,00,000 from the person who ordered the construction work in Gyeyang-gu E.
Defendant
A is the head of the construction site and the person in charge of safety and health management at the construction site, who is responsible for the safety and health of his/her employees and contractors.
1. Defendant A violated the Industrial Safety and Health Act as follows as a result of the supervision at the construction site of the horse iron market conducted on June 21, 2016 at the above site.
A. Although a business owner has installed a safe passage to be used by a worker at a place or workplace leading to the workplace and maintained at all times a safe passage, he/she did not have a proper work passage for entry to and exit from the said construction site.
B. In the event that a business owner installs a temporary passage, he/she did not install a safety rail on the side of the temporary stairs for entry and exit for modification in the construction site, even though the safety rail is to be installed at a place at the risk of fall.
(c)
The business owner is required to install a safety rail, etc. at a place where workers might fall down as the end or opening of the work board and the passage, but the safety rail, etc. was not installed at the upper part of the excavation and excavation of the house in the construction site.
(d)
In the event that a business owner performs a work by assembling a mobile vision, he/she is required to install a safety rail at the highest part of the vision, but he/she did not install a safety rail at the highest part of the mobile-type rail installed inside the house modification inside the construction site.
(e) In the event that the excavation work might pose a risk to workers due to the collapse of the ground or the falling of soil and rocks, the business owner shall, in advance, install earth mounds.