(영문) 서울중앙지방법원 2019.11.29 2016가합569058
손해배상(기)
Text

1. As to KRW 3,038,551,970 and KRW 3,019,732,105 among the Plaintiff, the Defendant shall pay to the Plaintiff KRW 18,819,865.

Reasons

1. Basic facts

A. The pertinent Plaintiff is a company that constructs, manages, and operates wind power generators located in Thai City, and the Defendant is a company that runs non-life insurance business, etc. under the Insurance Business Act and relevant Acts and subordinate statutes.

B. 1) The Plaintiff entered into a purchase establishment contract between the Plaintiff and D Co., Ltd. (hereinafter “D”) on November 7, 201.

(ii) between 18,700,000,000 IEC 6140-1 (international standards on the design standards for wind power generators) for the total contract amount of 18,70,000,000;

IEC only 61400-1

(A) 5 wind power generation devices in Category IIA (No. 1, 2, 3, 7, 8, and 7). Of them, wind power generation devices in Category VII (No. 7) are “No. 7”.

) A contract under which the purchase, production, supply and installation is to be made (hereinafter referred to as “the contract for the purchase and installation of this case”).

AB concluded the agreement.

The main contents of the purchase installation contract of this case are as follows.

Part I purchase contract of the purchase installation contract of this case

1. Title of contract: E contract;

2. Construction name: F construction works;

3. Contract amount: 18,700,000,000 won (including value-added tax) shall be designed in accordance with the contract terms, and if necessary, the contractor (D; hereinafter the same shall apply) shall prepare and provide procedures, lists, drawings and materials in accordance with the contract terms and conditions, and shall, if necessary, provide technical assistance, and, if necessary, install the site after delivery.

§ 1.22.1. contractors shall indemnify us and their employees and technical assistance service providers for any personal and material damage resulting from the negligent or intentional conduct of any subordinate recipient or his or her agent in connection with the performance of the contract.

In addition, the contractor shall be from a third party with respect to the implementation of this contract.