(영문) 인천지방법원 2020.02.19 2017가단255916
손해배상(기)
Text

1. The Defendant’s KRW 2,966,756 to the Plaintiffs and its related KRW 5% per annum from December 23, 2017 to February 19, 2020.

Reasons

1. Basic facts

A. On April 2016, the Plaintiffs entered into a contract for construction works (hereinafter “instant contract”) with respect to the construction of a 4th floor building on the ground D in Jung-gu, Incheon, Jung-gu (hereinafter “Seoul”) as follows.

1. Summary;

(a) This project sets out as all matters for the performance of new construction works for project owners (hereinafter referred to as “project owners”) and construction contractors (hereinafter referred to as “contractors”) D multi-households;

(b) Date of commencement of a contract: Total contract amount (including additional construction works) on September 8, 2016: KRW 400,000,000 (including KRW 400,000).

2. Scope of supply and specifications;

(a) Scope of supply 1) Basic Construction - Design changes, such as basic structural frame and windows, doors, lighting, electricity/communication facilities, etc. - Toilets (excluding urinals, renals, renals, three-dimensionals, and shower facilities) and lighting facilities - (2-4th floor), air conditioners (excluding the main generation of four-storys), drums, laundrys, attached facilities, gas sirens (4th floor), air conditioners (4th floor), cooling stations (excluding the main generation of four-story), each stud and four-story each installation of individual boiler - incidental civil boiler (or sewage/ septic tank construction), parking lots (materials 2th floor reticulator and 1st floor expansions) - Public charges (including reticulator and 4th floor construction costs) will be borne by the orderer for the work and the orderer for the work of the work of the work of the work of the work of the work of the work of the work of the work of the work of the work of the work of the work of the work of the commercial and the work of the work of the work of the work.

(b)to be constructed with the same level of materials as inside E in principle as the supply chain 1) construction is to be conducted; 2) construction is to be conducted with mutually agreed drawings standards;

3) A septic tank shall be installed. 4) When connecting the outside of a sewerage system, civil petition issues will be resolved by the ordering person.

5) With respect to the additional construction of a commercial building outside the commercial building, the contractor shall make a decision after consultation with the ordering person. 3. The contract price of the construction project (asy as possible) shall be the additional tax (VAT).