(영문) 의정부지방법원 2018.02.08 2017고정1186
재물손괴
Text

The defendant shall be innocent.

Reasons

1. Facts charged;

A. On September 12, 2016, the Defendant newly constructed a new apartment site of the victim C Co., Ltd. located in Gyeonggi-gun B, Gyeonggi-do, on September 12, 2016, using a color rosium in the outside pents installed in the victim’s construction process and as soon as possible on the outside pents installed therein.

I would give an accusation to the unauthorized User.

The content of “the property owned by the victim” was written to damage the victim’s property so that the amount of the repair cost is not large.

B. At around 10:00 on September 23, 2016, the Defendant destroyed the property owned by the victim to the extent that the amount of the repair cost is not higher than the amount of the repair cost, using the scam car as soon as possible on the outside pents installed by the said victim to the effect that “when entering private land without permission, an accusation shall be made at the time of entry without permission.”

(c)

around 10:00 on October 17, 2016, the Defendant destroyed the property owned by the victim so that the amount of the repair cost can be increased by using a chrode car as soon as possible on the outside pents installed by the said victim.

2. According to the evidence duly adopted and examined by the court, the following facts are as follows: ① A Co., Ltd., the representative director of which is the Defendant, was the executor of the F apartment construction project (hereinafter “new construction project of this case”) and around 201 as the executor of the F apartment construction project of Eunpyeong-gun E and nine parcels; ② G Co., Ltd. subcontracted steel reinforced concrete construction work to H; ② on September 21, 201 and January 4, 2012, G Co., Ltd., Ltd., the instant new construction site and its adjoining land, built a temporary fence on the ground B (hereinafter “instant land”); ③ thereafter, J Co., Ltd., through the public sale procedure following the suspension of the new construction work of this case.

arrow