logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 대구지방법원 서부지원 2015.06.26 2013고단1734
특수절도등
Text

A defendant shall be punished by imprisonment for not less than one year and six months.

However, the execution of the above punishment shall be suspended for two years from the date this judgment becomes final and conclusive.

Reasons

Punishment of the crime

On November 15, 2012, the Defendant was sentenced to six months of imprisonment with prison labor and two years of suspended execution for special larceny at the Daegu District Court on November 15, 2012, and the judgment became final and conclusive on June 8, 2013.

1. On April 22, 2009, the Defendant: (a) put up a container at the construction site of the Daegu-gu Seoul Building Site; (b) put up a lux tape in the container inside the container in advance so as not to put the emergency level; and (c) opened a joint board, from April 22, 2009 to April 23, 2009, when the victim D set off, set up a lux board, which was installed to prevent the container windows from being put out of the container, and intruded inside the container.

2. The Defendant: (a) intruded the said container at the time and place described in paragraph (1); (b) went with approximately 45 million HIV 2.5S Q Q cable 200 ta; and (c) HIV 4S Q cable 200 ta, which is the market price owned by the said victim.

Accordingly, the defendant stolen the victim's property.

On November 15, 2012, the Defendant was sentenced to imprisonment with prison labor for six months with prison labor for an attempted special larceny at the Daegu District Court on November 15, 2012, and the said judgment became final and conclusive on June 8, 2013.

The Defendant left the construction site with a sense that he can steals construction materials, such as electric wires, etc. kept therein, by leaving the cres without surveillance.

1. On September 26, 2009, from around 19:00 to around 07:00 of the same month, the Defendant: (a) when G, an employee of the victim F, was removed from the apartment site north-gu, Ulsan Metropolitan City; and (b) when G, an employee of the victim F, was installed at the apartment site in Ulsan Metropolitan City, the Defendant laid off the cre without surveillance, the Defendant laid off the creb, 1 column (a. 150 cm, a height of about 50 cm, about 150 cm), and intruded into the construction site.

Accordingly, the defendant invadedd the victim's structure.

2. A thief Defendant intrudes into the construction site on the date and time set forth in paragraph 1, at the same place, and after preparing in advance a container’s heat reduction note, attached a hearing tape so as not to put up an emergency level, and installed on container windows.

arrow