(영문) 대전지방법원 2018.09.05 2016가합105590
구상금
Text

1. The Defendants jointly share KRW 175,723,820 with respect to the Plaintiff and the period from August 2, 2018 to September 5, 2018.

Reasons

Under the Industrial Accident Compensation Insurance Act (hereinafter referred to as the "Industrial Accident Insurance Act"), the Plaintiff is a special corporation that performs industrial accident compensation insurance affairs entrusted by the Minister of Employment and Labor.

D Co., Ltd. (hereinafter referred to as “Nonindicted Company”) subcontracted the instant construction to F while carrying out construction works on the Daejeon E-gu E-building (hereinafter “instant construction”) as the subscriber of the industrial accident compensation insurance under the Industrial Accident Insurance Act (hereinafter “Industrial Accident Insurance”). G worked as a concrete worker at the construction site of this case.

Defendant B is the H’s representative engaging in the construction business, construction machinery contracts, and rental business, and is the owner of the I-vehicle concrete pumps (hereinafter “instant pumps”). Defendant A is the one-time container company affiliated with H and driving the instant pumps, and Defendant C Co., Ltd (hereinafter “Defendant C”) is the insurer who concluded the instant comprehensive automobile insurance contract with respect to the instant pumps.

Defendant A, at the construction site of this case on October 3, 2013, installed the instant pumps in a manner that, in order to conduct concrete string operations at the instant construction site, he installed a group of timber trees at each part of the instant construction site, installed a group of timber trees on the part of the instant pumps, installed a group of timber trees on the part of the instant pumps, and installed the instant pumps at the part of the instant pumps (undevelopedger and a device that gets off on the part of the vehicle) by fixing the ice of the instant pumps on the part of the scrap.

However, the place where the pumps of this case were installed was where the fracks the ground in the construction process and covers the ground with soil before one month, but it was caused by the ground subsidence during the concrete routing work, and thus, the fracks the fracks pipe of the pumps of this case, and the fracks the fracks pipe of G head in the vicinity.