(영문) 수원지방법원여주지원 2014.11.20 2014가단31181
손해배상(자)
Text

1. The defendants each of the plaintiffs A is 22,00,000,000 won, and 13,000,000,000 won, respectively, to the plaintiff Eul and the plaintiff C.

Reasons

1. Occurrence of liability for damages;

A. The facts of recognition (i.e., Defendant Company (hereinafter “Defendant Company”) is a company incorporated for the purpose of construction business, etc., and is the user of Defendant D and the owner of Defendant E E E E E E E E vehicle (hereinafter “instant cke”).

B. At around 11:20 on November 12, 2013, Defendant D: (a) driven the instant strawline to move approximately approximately 2.1m of the length of the H beam at around 8.5m from the construction site of the new warehouse building in G factory located in G in G in G in Gwangju City; (b) felled into the floor by the h beam connected to the instant straw, and then shocked the following work instructions: (c) the h beam connected to the instant straw; (d) the h beam fell into the floor; and (e) the h beam fell into the floor.

(hereinafter referred to as “instant accident”). H (hereinafter referred to as “the deceased”) due to the instant accident was killed due to the suspension of cardiopulmonary function due to serious damage on the spot, on-site and by the suspension of cardiopulmonary function due to serious damage.

Defendant D was issued a summary order of KRW 3 million on March 24, 2014 in the case of occupational negligence death by the Suwon District Court 2013 High Court Sungnam Branch 2013 High Court Branch 12339 regarding the instant accident, and the said summary order became final and conclusive around that time.

x) Plaintiff A is the wife of the Deceased, and Plaintiff B and C are the offspring of the Deceased.

[Ground of recognition] Facts without dispute, Gap's 1, 2, 5, 6 evidence, Eul's 1-1 to 4, the purport of the whole pleadings

B. According to the evidence as seen earlier, Defendant D, who is engaged in the business of moving the sn beam beam by driving the instant sn beam and is engaged in the business of moving the sn beam while operating the instant sn beam, is bound by the sn beam line using a wire-line and a snife showline so that the snife beam connected during the operation of the instant snife does not fall, and operates the snife under the control of a third party’s access to the dangerous area connected to the snife, and in particular, if there are other workers in the dangerous area, the snifline is lost balance due to the sniff’s operation and does not fall to other workers.

arrow