Text
1. Defendant shall be punished by a fine of KRW 3,000,000;
2. Where the defendant does not pay the above fine.
Reasons
Punishment of the crime
B contracted for the removal of a mushroom farm in Dongbcheon City, and ordered the Defendant and the other people to remove the mushroom farm.
On December 28, 2014, at around 09:00 on December 28, 2014, the Defendant, at the construction site, carried out the H beam of the steel structure ( approximately 5m, approximately 0.2m, and approximately 400kg in length), and other figures, including the victim D (age 54), carried out a feling operation where the H beam is fixed.
However, in the above work process, since the sloping beam is in danger of harming people in the surrounding area when scke beam sckes over the sckes, B, a construction manager, assigned a signal signal for sckes work, checked whether the sckes completely removed from the scke beams in accordance with the above signal number instructions, instructed the sckes to operate the sckes on the spot, and had a duty of care to prevent safety accidents in the field, and the Defendant, an engineer, had a duty of care to operate the sckes in compliance with the Ccke safety rules.
Nevertheless, B instructed the removal work without allocating the signal number to assist the towing work, left the site without any direction and supervision over the Cretain safety rules. Defendant A connected the Cretain with the H beam without signal number in violation of the Cretain safety rules, and caused the victim, who was in the nearby area, by occupationally connected the Cretain with the cretain, using the back part of the head in the H beam which was sreck, and caused the victim to face on the back side of other H beam which was in front of the victim, and caused the victim to suffer about four weeks of the escape or loss of the internal organization in need of treatment.
Summary of Evidence
1. Defendant's legal statement;
1. The suspect interrogation protocol against the defendant.