(영문) 대구지방법원 2015.10.30 2013가단820235
건물철거 및 토지인도
Text

1. The Plaintiff (Counterclaim Defendant) is not less than 142.8 square meters between Daegu-gu B and 142.8 square meters to the Defendant (Counterclaim Plaintiff).

A. Attached Form 6, 7, 8.

Reasons

1. Basic facts

A. (i) The Plaintiff completed the registration of ownership transfer on December 1, 1964 on the land and building B in Daegu-gu, Daegu-gu (hereinafter “instant land”) and on the housing on November 12, 1964 and on November 20, 1964.

B. The Plaintiff, around the 1970s, newly built the existing house on the ground of the instant land and the two buildings of reinforced concrete slab roof (13.6 square meters in the first floor and retail stores, 113.6 square meters in the second floor, and 113.6 square meters in the second floor) and obtained the approval for use on February 8, 1983.

B. As to land and buildings owned by the Defendant: (i) the land and buildings owned by the Defendant: (ii) the land and buildings in Daegu Jung-gu; (iii) the land adjacent to the instant land in Daegu Jung-gu, Daegu-gu, Daegu-gu, 132.9 square meters (hereinafter “C land”); (iv) the registration of ownership transfer was completed on October 18, 1960 due to the sale on October 11, 1960; and (v) E completed the registration of ownership transfer on the same day after being awarded a successful bid at the voluntary auction on November 25, 2009; and (v) the Defendant completed the registration of ownership transfer on April 30, 2010 due to the sale on March 3, 2010.

- On May 18, 1961, the above D newly constructed a wood farm house of 53.55 square meters on the land of this case (approval for use) and used the part of (b) inside the land of this case as marina, and around the time of the new construction or thereafter, he created and used a customary toilet, sprink, sprink, etc. on the ground of the part of (b) above.

Although the building ledger was registered as owned by the above D in the building ledger, the register was not registered in the register, and the application for cancellation of the building ledger was filed on April 28, 2010 on the ground that the above E was removed, and thereafter the above building was revoked ex officio on the ground of removal on May 24, 2010 on the building ledger.

From that time to that time, the part in the ship is in the site.

This case is intended to connect each point of 9,10 of the annexed sheet No. 9, 10 among the above removal around the above removal.