(영문) 울산지방법원 2014.09.23 2014고단1903
업무상실화
Text

1. Defendant A’s fine of KRW 7,000,000, Defendant B’s fine of KRW 10,000,000, and Defendant C’s fine of KRW 2,000,00.

Reasons

Punishment of the crime

Defendant

B A served in two parts for the preservation of victims E (Representative F) in Ulsan-dong-gu, Ulsan-gu, and Defendant A works in G, a subcontractor of E, while Defendant C retires from G, a subcontractor of E, to Oct. 2, 2013, and currently is a person who works in H, an subcontractor of E, a subcontractor of E, to whom Defendant C retires from Jun. 2012 to Oct. 2013.

The Defendants, around September 9, 2013, had a small capacity of the E Construction Equipment 1 Factory North N7 Factory Parts Doz. in Ulsan-gu I, Ulsan-gu, and had a small capacity of the upper tank to replace a shooting tank, and Defendant B had a field management and safety manager, Defendant A and C had a worker work.

As the pipeline length of the franchise connection part among them does not meet the length, new tank connection parts were cut using gas cutting devices.

The defendants Gap and Eul, who are responsible for fire-fighting, have a duty of care to take measures to prevent scattering, such as dints, etc., when they perform fire-fighting work, at a place where parts painting work in a factory remains in the wall or air, and when they perform fire-fighting work such as contact and sprink, etc. inside a building where combustible materials are installed, they had a duty of care to take measures to prevent scattering, such as divers, divers, fire-prevention, etc.

Nevertheless, the Defendants neglected this around 13:13 on September 9, 2013, and caused occupational negligence to cut off the above E construction equipment 1 factory North N7 factory parts design to an oxygen folder without proper safety measures, such as fire spreading to the nearby walls of the work site and installing a cover for the prevention of melting scattering, etc. inside the factory book keeping the sprink of the sponsor of the sponsor of the sponsor, attached to the side wall of the water tank replacement work.