logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 서울동부지방법원 2016.06.09 2014가단49853
건물명도등
Text

1. Mainly, the Plaintiff from among the F Ground Buildings in Seongdong-gu Seoul Metropolitan Government:

A. Defendant B and C shall indicate in attached Form 1.

Reasons

1. In full view of the descriptions of Gap evidence 6-1, 2, Gap evidence 13, Eul evidence 13, Eul evidence 1 and 2, and the purport of the entire pleadings (including the fact that there is no dispute) as a result of the court's commission of appraisal to appraiser H, the following facts are recognized:

A. On November 20, 1972, the details of changes in the building were newly constructed on the ground of F-F factory site 1,322.3 square meters (hereinafter “instant factory site”) in Seongdong-gu Seoul, Seongdong-gu (hereinafter “instant factory site”) a reinforced concrete factory (hereinafter “factory-1”; hereinafter “factory-1”), cement brick structure (hereinafter “the following drawings”), and cement brick structure water level (the size of the area changed, but the area changed, appears to be the “water level room” of the drawings below; hereinafter “water level room”).

Then, around December 28, 190 on the ground of the factory site of this case, light steel-3 factories (hereinafter “factory-3” in the following drawings) and the Deputy Secretary of Cement and Cement (hereinafter “Deputy Director of Cement”) were installed. On May 27, 1991, light steel-frame factories (the size was 146 square meters, and the size was 176 square meters, but the size was changed to 176 square meters; hereinafter “factory-2” in the following drawings) were extended on June 1, 1991.

At present, on the ground of the factory site of this case, there are factories-1, factories-2, factories-3, water levels rooms, toilets, toilets, cement block restaurants (hereinafter referred to as the “cafeterias”) and among them, factories-3, Sejong Deputy General, cement block restaurants, and water level rooms of 43.61 square meters of the 2nd floor sand panel in the building management ledger is not registered.

B. On December 20, 1973, I purchased the factory site of this case and the factory newly built on the ground, and completed the registration of ownership transfer on December 20, 1973, and completed the registration of ownership transfer on the above factory site, on December 31, 1973, on December 31, 1973, the above ground factory-1, toilets, and water level rooms.

I shall be registered on April 3, 2012 on the basis of donations.

arrow