Text
1. The Defendant’s KRW 70,997,00 for the Plaintiff and its related KRW 5% per annum from September 2, 2017 to April 9, 2019, and the next day.
Reasons
1. Facts of recognition;
A. From around February 2003, the Plaintiff entered into a construction contract with the Defendant, who runs the electric construction business with the trade name D around February 26, 2015 to increase the 20KK to 50K for the purpose of expanding the size of the ground of 3,860 square meters owned by the Plaintiff, to design and construct a plastic equipment construction project on a scale of 3,860 square meters, including 16 electric utility meters, the 16th thermal wave, the 2ndr, the 2ndrr, and the 1strmothr, and the 1strmothr, and the 16thrmothr and the 16thrmothr and the 16thrmothr and the 16thrmothr and the 16thrmothr and the 16thrmothr and the 16thrmothr and the 16thrmothr and the 16thrmothr and the 16thrmothrmothr.
(Attachment 1) The blocking machine A is parking short-term: Provided, That the individual electric power quantity of 1 damp-gu is not 8.892K but 8.692KW).
According to the above construction contract, the defendant submitted to the Korea Electric Power Corporation an application for expropriation to increase 30KW from the existing contract quantity to the Korea Electric Power Corporation, and for the extension of 1 portable period, the defendant replaced the fixed-term parking spaces of 75AT (hereinafter referred to as "A breaker"), and additionally installed a part breaker of 50AT blocking capacity connecting A breaker and D breaker (hereinafter referred to as "B breaker prior to replacement") and a part breaker of 50AT blocking capacity connecting parking short-term and enlarged scheduled to extend (hereinafter referred to as "C breaker"), which connects portables scheduled to extend, from the electric measuring machine through the connected line of the parking short-term to the above 50AT shuter.