(영문) 대구지방법원영덕지원 2015.05.14 2013가합302
손해배상(기)
Text

1. The Defendants jointly committed against the Plaintiff KRW 54,967,545, and Defendant Korea Electric Power Corporation as to this, July 12, 2013.

Reasons

1. Basic facts

A. The Plaintiff set up 4 plastic houses (limited to the instant greenhouse) with a size equivalent to 5,324 square meters on the land outside B, Ulsan-gun, Chungcheongnam-gun, and the Plaintiff is a person engaged in the business of cultivating organic farmers, Ulsan-gu, and the Defendant Korea Electric Power Corporation (hereinafter “Defendant Korea Electric Power Corporation”) is a public corporation established under the Korea Electric Power Corporation Act for the business of developing and developing electric resources, transmitting, transformation, distributing electric power, and its related business. Defendant Daesung Electric Power Co., Ltd (hereinafter “Defendant Daesung Electric”) entered into a contract with Defendant Han-gun to implement restoration work by urgently operating the electric power distribution equipment in accordance with the direction and request of the Defendant Han-gun prior to the occurrence of an accident requiring the emergency restoration of electric power distribution equipment between the Defendant Han-gun and Han-gun.

B. On March 26, 2012, in order to use the boiler, etc. to be installed in the greenhouse of the instant case, the Plaintiff filed an application for electric use with the Defendant under his or C’s name, stating “use for agriculture” and “principal products”, and applied for electric use with the capacity of 90 kw, and the Plaintiff entered into the supply contract with the Defendant Han River in his or C’s name (hereinafter “instant supply contract”).

C. In order to supply electricity under the instant supply contract, Defendant Han-dong installed three transformers (each capacity: 30 kws) in the utility poles located near the instant greenhouse, and among which one of them was the change voltage (hereinafter “first change voltages”) was used for the change voltage of electricity supplied to two households (D and E) located near the instant greenhouse, and the remaining two change voltages (hereinafter “second change voltages”) were used for the change voltage of electricity supplied to the instant greenhouse.

On January 2, 2013, at around 04:06, the accident causing the destruction of the 1st voltages occurred, and the defendant Han-dong requested the replacement of the 1st voltages through the automatic monitoring system, and the defendant Han-dong requested the replacement of the 1st voltages to the defendant Taesung Electric.

arrow