logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 대전지방법원천안지원 2015.11.25 2014가단17509
중개수수료
Text

1. The plaintiff's claims against the defendants are all dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

1. Facts of recognition;

A. The Plaintiff is operating a real estate brokerage office in the name of real estate broker, and in the name of “E real estate” in Seo-gu, Seoan-gu, Seoan-gu.

B. From February 28, 2014, Defendant B owned 269.1 square meter (hereinafter “F land”) in Seoan-gu, Seoan-gu, Seoan-gu, Seocheon-si and 270 square meter (hereinafter “G land”) respectively.

Defendant B tried to construct a building on each of the above land and transfer it to another person along with the land, and also issued an earning rate analysis report on the building to be newly constructed to neighboring real estate brokers.

Plaintiff

In addition, Defendant B received an earning rate analysis table on the building to be newly constructed on each of the above lands.

C. On September 29, 2014 and September 30, 2014, Defendant C, along with H, I (hereinafter “Defendant C”), committed “E real estate” operated by the Plaintiff to examine the current state of the studio building in the tent area and the available building.

At this point, the Plaintiff explained to Defendant C Il-ju about the current status, prospects, return on profit, etc. of the studio building in Seo-gu, Seocheon-gu, Seocheon-gu, Seocheon-gu, JJ, including the return on profit from each of the above lands and buildings owned by Defendant B.

In addition, the Plaintiff directly visited and examined the nearby studio building with Defendant C’s office work.

(The Plaintiff asserts that the building visited with Defendant C was the land, building, G land, and building owned by Defendant B. On the other hand, H appeared as a witness in this Court and stated that each land and building owned by Defendant B did not have any visits). However, Defendant C returned from that place to the Plaintiff’s brokerage without concluding any sales contract.

Defendant C’s land from Defendant B on October 8, 2014 and its ground reinforced concrete structure (refinite) structure, 16.6 square meters for 16.6 square meters for 16.6 square meters for 4 stories for 160.12 square meters for 2 through 4 stories (hereinafter “F building”) shall be KRW 1.09 billion.

arrow