logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 수원지방법원 평택지원 2013.03.07 2012고단820
건조물침입등
Text

1. Defendant A shall be punished by imprisonment with prison labor for one year;

However, the above sentence shall be executed for two years from the date of the final judgment.

Reasons

Punishment of the crime

1. Part of the crime committed by Defendant A

A. At around 10:00 on March 19, 2012, the Defendant: (a) cut off the locks set up with the steel bars set up in D and seven lots of land; (b) cut off the locks set up in advance at the entrance of the new construction site; and (c) intruded the structures of the victim, which are managed by F.

B. The Defendant suffered property damage.

At the time and place specified in the paragraph, the victim G-owned market price was cut and destroyed by the above methods.

C. At around 14:00 on March 23, 2012, the Defendant cut off from the above construction site on the 7th floor size of the 2nd underground floor that was not completed and moved to the floor, thereby having B, etc. transport approximately KRW 11,50,000 of the market value of the 2nd underground floor that was the victim F-owned company, which was the victim F-owned, to the height of the 23 tons of the H 23 tons of the 23 tons of the 23th ground on the ground of the 150,000 square meters. (2) The Defendant cut off from the above construction site at around 18:00 on March 24, 2012 and moved to the floor by the same method, and stolen it by having B, etc. transport approximately KRW 7,700,000,000 tons of the H 14 tons of the market value of the victim F-owned company to the above high water site.

3) On March 25, 2012, the Defendant cut to the above construction site at around 13:27, and cut the floor and transported approximately KRW 8.5 million of the market value of the victim F Co., Ltd., Ltd., which was transferred to the floor, to B, etc., to transport the 17 tons of the H beam beam equivalent to the 8.5 million market value on the above body site. (4) On March 25, 2012, the Defendant stolen it by having B, etc. transport approximately KRW 18 tons of the H beam beam amounting to the floor on the above body site at around 18:10 on March 25, 2012.

5 The Defendant, at around 19:10 on March 25, 2012, cut to the above construction site at around 19:10, and cut to the floor by the same method, and then moved to the floor, the H beamline equivalent to approximately KRW 9.5 million at the market price of the Victim F Co., Ltd., Ltd. B.

arrow