logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 춘천지방법원 2017.09.05 2017가단1151
손해배상등
Text

1. The Defendant: (a) KRW 8,900,000 for the Plaintiff and 5% per annum from February 28, 2017 to September 5, 2017.

Reasons

1. The Plaintiff’s assertion that the Defendant: (a) while serving as the Plaintiff’s employee at the construction site B of the Gangseo-gun Hongcheon-gun, the construction site of the Gangwon-gun, the construction site of the Gangseo-gu, the construction site of the Gangwon-si, and the D construction site of Chuncheon-si, the Plaintiff temporarily stolen the steel bars, electric wires, etc.; (b) thereby, the Plaintiff suffered damages equivalent to KRW 106,190,000 in total due to the discontinuance

2. Determination

A. Fact 1) The Plaintiff is a company running a construction business. The Defendant was working for the Plaintiff at the construction site of Hongcheon-gun B, Gangwon-gun C, Gangwon-do D Corporation, Chungcheongbuk E Corporation Section 2. The Defendant’s special larceny crime (hereinafter “instant crime”) committed with F, together with F, at the construction site of Hongcheon-gun, Hongcheon-gun, Seoul, and F, at the construction site of the Defendant’s Hongcheon-gun, Hongcheon-gun, and the G galle-ro, which was driven by the Defendant. The Defendant cut off the temporary electric wires prepared by the Plaintiff to conduct a tunnel lighting work in advance, cut them into the above vehicle, and cut them into the above vehicle, and cut them into the above vehicle at the construction site of the Hancheon-gun, Seocheon-gun, Seocheon-gun, Seocheon-si, and the construction site of the Chungcheongbuk E Corporation 2. The Defendant reported the Plaintiff’s temporary cutting on October 1, 201 with F, and set the Plaintiff’s low construction site at the construction site of the 20.

C) On September 2009, the Defendant, along with H, cut off approximately 10 tons of a 15 tones of a dump truck with H, at the construction site of Chuncheon-si in the middle and middle order, and around 12:00,000, the market price of the Plaintiff’s possession of the Plaintiff, which was stored at the site, for the construction work, was 4.5 million won at the construction site of the 15 tones of a dump truck by using a dump accelerator, with I, J, and I, at around 12:0 on the first half of October 2012, and the market price of the Plaintiff’s ownership, which was stored at the site of the dump E work site at around 12:50,00 on the first half of the year.

arrow