logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 부산지방법원 2021.01.28 2018가합46120
손해배상(기)
Text

The plaintiff's claim against the defendants is dismissed in entirety.

Litigation costs shall be borne by the plaintiff.

Reasons

1. Basic facts

A. The Plaintiff is a person who engages in construction machinery rental and contracting business while operating Kimhae-si E materialsF.

2) Defendant B, who is the representative of H located in G in Kimhae-si, engaged in the sale and purchase of construction machinery, and Defendant C, who engages in the construction machinery brokerage business, was engaged in the sale and purchase of Jump trucks (hereinafter “the instant fire vehicles”), K dump trucks (hereinafter “the instant vehicle No. 1”), and Mump trucks (hereinafter “the instant vehicle No. 2”).

3) Defendant D sold Pump trucks (hereinafter “instant 3 vehicles”) to the Plaintiff as a person operating N in Gangseo-gu Busan, Busan.

B. In the relevant criminal judgment, the Plaintiff: “The Plaintiff and I, and Defendant C, who borrowed dump trucks as collateral, operate a dump truck at the construction site, which is a large number of vehicles purchased through Defendant C on October 20, 2016, with a view to providing loans from the lending company as a normal dump truck that is unable to be operated normally due to damage, etc.; and the Plaintiff conspired to purchase Jump truck, which is a fire vehicle of this case, which is the instant fire vehicle completely added due to fire, through the brokerage of Defendant C; by deceiving the victim Q Q Co., Ltd.; by deceiving the victim Q Co., Ltd.; by deceiving the victim Q Co., Ltd., it was wired from the damaged company for the purpose of loans; however, the Plaintiff operated the dump truck, which is a large-scale vehicle purchased through Defendant C through Defendant C, at the construction site, but should undergo a regular inspection, but the Plaintiff’s registration number of the vehicle should be changed to the registration number of the Plaintiff’s dump.

“The Defendant is not guilty on January 9, 2020 after having been prosecuted for facts constituting a crime, etc.

arrow