(영문) 의정부지방법원 2019.05.01 2017가단22537
건물명도
Text

1. The Defendants jointly engage in real estate listed in the separate sheet to the Plaintiff:

(a)for the purposes of the Schedule 6, 7, 8, 9, and 6, respectively;

Reasons

1. Facts of recognition;

A. The Plaintiff’s acquisition of ownership, etc. 1) Real estate listed in the separate sheet (hereinafter “instant building”).

on August 26, 1986, approved to use as a total of six households, and for the same year.

9.5.Before each time, the classification was registered by each household.

2) On July 20, 2017, the Plaintiff acquired No. D’s underground floor (52.56 square meters) from the instant building due to sale and purchase. B. As of the date of closing argument of the instant case by the Defendants, the Defendants, as married couple, possess and jointly use a single entrance of 115 square meters (hereinafter “instant building”) of the 115 square meters of the underground floor of the instant building, which connected each point of 6, 7, 8, 9, and 6, in sequence, among the instant building, connected each point of 6, 7, 8, 9, and 6.

2) In addition, the Defendants are one square meter in the boiler room attached to the Gangll Location Team and the Banll roof, which connects each point of the attached Form 10, 11, 12, 13, and 10 in sequence of the attached Form 10, 11, 12, 13, and 10 (hereinafter “instant boiler room”).

(3) The Defendants install a boiler in the boiler room and use the boiler in the above boiler room. 3) The Defendants install each of the steel gate with a width of 1.4m wide, 1.9m high and 2.1m high and 2.1m high (hereinafter referred to as the “each of the instant doors”) on the line connecting each point in order to connect each point of 1.4m wide, 1.9m high and 8,15m high and 2.1m high to the line (hereinafter referred to as the “instant gate”) on the line connected in order to each point of 14, 2, 15, 8, 13, 12, 11, 10, and 14 in order to exclusively occupy and use the land attached to the concrete package (mail per hereinafter referred to as the “instant gate”).

【In the absence of dispute, Gap 6, 11, 12 evidence, Eul 1 and 5 evidence (including paper numbers, hereinafter the same shall apply), the result of the on-site verification by this court, the result of the appraiser’s appraisal, the purport of the whole pleadings

2. The assertion and judgment

A. The gist of the parties’ assertion is that the Defendants did not have any legitimate title.

arrow