(영문) 창원지방법원 2020.08.13 2020고정362
업무상과실치사
Text

Defendant shall be punished by a fine of KRW 5,000,000.

When the defendant does not pay the above fine, 100,000 won.

Reasons

Punishment of the crime

As a worker employed by B, the Defendant is an article that operates and operates concrete pumps at the site of reinforced concrete construction works among the "D Construction Works" located in Seongbuk-gu, Changwon-si.

E is a person in charge of safety and health management responsible for the safety and health of employees under F’s control as the site manager of the aforesaid “refinite concrete construction work.”

E around 15:11 on October 16, 2019, around 15:11, the Defendant, an employee of B, had the Defendant operate and operate concrete pumps, and had the victim G (V and 43 years old), a worker of F Co., Ltd. (F), build the end of the booming boom connected to the said pumps and build concrete.

At the time, the ground was excavated due to construction, and the site was filled with soil, and the rainwater is not treated as waterproof on the ground, and the intensity of the ground was weak. The defendant, the driver of the law firm, inspected the ground condition, fixed the boom on the strong ground ground, installed the boom of the law firm, and extracted the boom from an appropriate length to prevent the accidents due to the collapse of earth and sand or the electric power of the law firm by minimizing the load of the law firm. As the site manager, E, the safety and health manager, as the site manager, had the duty of care to prevent the accidents due to the collapse of soil and sand or the collapse of the law firm. In the event that there is a concern that the boom is in excess of concrete pumps due to the subsidence of ground, damage of the dust, etc., the duty of care was to prevent the accidents due to the collapse of soil and sand or the boom of concrete pumps.

Nevertheless, the Defendant neglected to do so and did not properly confirm the ground condition, and installed a pumps, and caused them to work with a maximum length of boom booms, and E neglected to do so.