(영문) 수원지방법원여주지원 2016.12.14 2015가합11440
손해배상(건)
Text

1. The plaintiff (Counterclaim defendant) is jointly and severally liable to the defendant (Counterclaim plaintiff) for KRW 360,379,740 and KRW 315,00,000 among them.

Reasons

A principal lawsuit and counterclaim shall also be deemed a principal lawsuit and counterclaim.

1. Basic facts

A. The plaintiffs are the parties 1) The plaintiffs are the U.S. O.O. H. (hereinafter referred to as the "O.O.").

(2) The term “N” (hereinafter “instant association”) is a “N” established for the purpose of jointly running a business, such as developing a electric housing complex, constructing a electric house, selling a unit, etc. in a P forest of 6,10 square meters, Q forest of Q, 4,389 square meters, and R forest of 1,071

) Members are members (Plaintiff E succeeded to the membership of the instant association from S.).

(2) The Defendant is a company running the housing site development business and the sales business, and U.S.’s husband (in-house director) is the actual operator of the Defendant.

B. On February 3, 2013, Plaintiff J, L, K, C, and I, the member representatives of the instant association (which appears to be the executive partner) of the instant association, concluded a construction contract (hereinafter “the instant construction contract”) with the Defendant and Q Q and one parcel of land (which appears to be PP land), on the basis of the construction cost of KRW 740 million (excluding value-added tax, KRW 340 million for the first and second construction cost, KRW 40 million for the second construction cost).

The main contents of the instant construction contract are as follows.

The members of the association of this case (hereinafter referred to as the "A") and the defendant (hereinafter referred to as the "B") of the contractor shall enter into the contract as follows:

Article 1 (Purpose of Contract) “B” shall be the first and second contracts for Q and one parcel-based construction project (the instant infrastructure construction project), which is contracted to “A”, and in return for the completion thereof, “A” shall be paid the remuneration therefor.

Article 2 (Scope of Construction Works) The scope of the basic construction under this Agreement is to change the reference points of the road in the complex from 93 to 88 by reference to the “Additional Design Map”, and the end of the road shall be changed from 79 to 82.

The south-side complex shall be at least four meters higher than roads, and the North-side complex shall be at least one meter.

§ 4.