(영문) 서울중앙지방법원 2015.10.30 2015가합502393
건축물철거 및 대지인도 등
Text

1. For the plaintiffs:

A. Defendant I is attached to the annexed sheet 3,562 square meters of J-gu Gwangju Mine-gu

1. Drawings Nos. 28, 29, 30, 31.

Reasons

1. Basic facts

A. The Plaintiffs related to the ownership of the instant land and Defendant H Co., Ltd. (hereinafter “Defendant H”) are co-owners of 3,562 square meters of J-gu Gwangju Mine-gu (hereinafter “instant land”).

The current situation and current shares of co-owners of the land of this case are as follows.

(2) Defendant 2: (3) G. 2 (1/5 on September 9, 198) L (1/5 on February 14, 1986) - (1/5 on February 14, 1986 - (1/5 - 1/5 on March 11, 1986) L (1/6) (1/5 on July 30, 1987) - (2/6. 6. 2/6. 5) Plaintiff A (356/36. 2/36. 5) on June 2, 2005 (2/6. 3. 5) on June 2-1, 2005) - Plaintiff 2 (2/6. 96. 5) on July 30, 198, Plaintiff 10-3 (2/356. 2/3562) on June 2-, 2005

B. On July 19, 198, S, a co-owner of the instant land, was connected in order to each point of the attached Form 20, 21, 22, 23, 24, 27, 28, 29, and 20 of the instant land among the instant land, and the land management 1) the size of 301 square meters in part (hereinafter “the instant land”).

(1) In the ship that connects each point of the attached Table 1 drawings to each point of 47, 48, 49, 50, 51, 52, 53, 54, 55, and 47, the size of the part ① above 193 square meters above the size of 193 square meters above the unit, the prefabricated type panel, the roof, and the one-story neighborhood living facilities (hereinafter “instant building”).

on January 9, 2012 after the new construction.