logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 서울고등법원 2016.10.28 2015나2066418
건축물철거 및 대지인도 등
Text

1.The judgment of the first instance shall be modified as follows:

2. For the plaintiffs:

A. Defendant I shall be 2,256 square meters of J-gu Gwangju Mine-gu.

Reasons

1. Basic facts

(1) Defendant 2: (3) Plaintiff 6.2 (No. 1/5) and Plaintiff 2 (No. 5/6.2) were 0.3 (No. 1/5) and Plaintiff 2 (No. 1/5) were 6.3 (No. 1/5) and Plaintiff 6.3 (No. 1/5) were 6.3 (No. 1/5) and Plaintiff 6.3 (No. 1/5) were 6.3 (No. 1/5 of 1986) and Plaintiff 6.6.3 (No. 36.30) were 9/6.6.8 (No. 1/6.30) were 6.6.3) were 5/6.8 (No. 356.2/3562) were 9.6.2) were 9/1985 (No. 96.2/196.2) were 95% of the inheritance.

B. On July 19, 198, S, a co-owner of the instant land, (1) connects each point of the attached Table 20, 21, 22, 23, 24, 27, 28, 29, and 20 of the instant land among the instant land, in sequence: (a) connects each point of the attached Table 3 drawings on the size 1, 301 square meters of the instant land (hereinafter “the instant land portion”) in the order of 47, 48, 49, 50, 51, 52, 53, 54, 55, and 47 of the attached Table 2 drawings to the instant land; and (b) connect each point of the attached Table 47, 48, 49, 50, 52, 54, 55, and 47 of the instant land.

arrow