(영문) 서울중앙지방법원 2019.09.06 2015가합582078
공사대금
Text

1. As to the Plaintiff’s KRW 6,477,813,071 and KRW 2,00,000,000 among the costs, Defendant Sinsi shall pay to the Plaintiff KRW 4,477,81, and KRW 4,477,813.

Reasons

Around October 2002, the Plaintiff entered into a contract for a construction project with B and Croad Construction Work (hereinafter “the instant construction project”). Around October 2002, the Plaintiff organized a joint contractor (hereinafter “joint contractor”) with the Plaintiff as its representative and with the Plaintiff’s share at 60% and the B’s share at 40%.

On October 11, 2002, the Plaintiff entered into a contract for a long-term contract with the Defendant Republic of Korea and the instant construction that was entrusted with the conclusion of the contract by the Defendant Sinsi, a procuring entity, for which the contract was concluded, with respect to the contract amount of KRW 75,218,00,000 and the construction period of the instant construction from October 21, 2002 to September 24, 2007 (hereinafter “instant contract”).

The main contents of the general conditions of the construction contract incorporated into the contract of this case (hereinafter referred to as the "general conditions of this case") are as shown in attached Table 1.

(2) On October 1, 207, 201. 75, 20. 75, 208. 1, 201, 20. 8 (20. 5. 1, 20. 1, 205, 20. 3. 1, 206. 1, 30, 206. 8, 20. 1, 206, 30, 40. 6. 1, 20, 206. 1, 20, 36. 1, 20, 206. 3, 1, 206. 1, 205, 206. 1, 206. 3, 16. 1, 205, 206. 1, 206. 1, 206. 1, 206.