(영문) 대구지방법원 2017.08.23 2016가단108264
손해배상(기)
Text

1. The Defendant’s KRW 15,00,000 as well as the Plaintiff’s annual rate of KRW 5% from April 29, 2016 to August 23, 2017.

Reasons

1. Facts of recognition;

A. The Plaintiff’s ASEAN (D) has been working as a field player from high school to high school.

B. At around 2013, C recommended the Plaintiff to study abroad, and introduced G, the representative of F, a company F, and the Defendant, the representative of H, a company H, to engage in a business such as arranging study in the sports players.

C. On April 2014, C retired from a domestic school at the proposal of G and was going to study in the Republic of Korea as a Spain. On June 2014, the Plaintiff paid KRW 20 million to G with the cost of opening a local team, the cost of a fish driving school, and the cost of softson, etc.

However, C did not enter any axis team until August 2015 and did not receive a proper course of study in Spain. D.

The Plaintiff asserted G and the Defendant that C did not have any outcome in the Spanish, and agreed that C should study from Germany at this time at the end of the consultation with them, and that the Defendant is in charge of the issue of visa issuance in Germany, the entry of the stable team, etc. in Germany, and that G should bear the expenses.

Accordingly, on September 6, 2015, the following contract was concluded in the name of H and the Plaintiff (hereinafter “instant contract”).

C player Germany-related investment contract A: A. B. a.m. a.m. a.m. a.m. a.m. a.m. a.m. A.m. a.m. a.m. a.m. a.m. a.m. a.m. a.m. a.m. a.m., Sept. 28, 2015.

(2) On September 28, 2015, A shall claim and proceed with the place of residence and living-related expenses in the followed-cellae zone to the F.S. Operation Company.

(3) A shall complete the issuance of B’s visa from September 9, 2015 to December 8, 2015.

(4) On October 1, 2015, A shall require B to register with a private teaching institute in the region where B is located.

(5) In ascertaining matters related to the language of Eul, Gap shall put the static axis team in an accelerator area within one month after the vision is completed.

(hereinafter referred to as "A") 6. A shall continue to stay.

arrow