logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 전주지방법원 정읍지원 2018.10.30 2017가단11115
토지인도
Text

1. The defendant shall be the plaintiff.

(a) Of each land listed in attached Tables 1 and 2, indication 1, 2, 3, 4, 5, 6, 7, 8, 8.

Reasons

Basic Facts

Attached Form

On May 29, 1981, the registration of each land entered in the list was completed on December 20, 1972 in the name of deceased C, the father of the defendant, deceased D, deceased D, deceased D's father's type E, F, G, H, and I (hereinafter collectively referred to as "instant seven persons"), and the registration of ownership transfer was completed on December 20, 1972.

After that, on November 25, 2009, the registration of ownership transfer for E-1/7 shares among the lands listed in the separate sheet was completed on November 6, 2009 in the network D, and on August 3, 201, the network D completed the registration of ownership transfer for the Defendant future on July 27, 201 with respect to one’s own 2/7 shares among the lands listed in the separate sheet on August 3, 201.

G on March 28, 2017, the registration of ownership transfer was completed in the Plaintiff’s future on March 20, 2017 with respect to one-seven shares of each land listed in the separate sheet on March 28, 2017.

Accordingly, the register of each land listed in the separate sheet is currently registered as the right holder of the plaintiff, E, C, F, I, and the defendant as the right holder of the 2/7 share.

(A) On the ground of 7m2 in the attached Table No. 1, 2, 3, 4, 5, 6, 7, 8, 9, and 1 among the lands listed in the attached Table No. 2, such as the land of each land listed in the attached Table No. 1, 2, 3, 4, 6, 7, 8, 9, and 1, the part of the land listed in the attached Table No. 1, 2, 3, 4, 6, 7, 9, among the land listed in the attached Table No. 1, 7m2, the part of the wall No. 1, 11, 12, 13, and 10 among the land listed in the attached Table No. 1, 50m2, the part of the (B) part of the attached Table No. 50m2

(C) Each of the above houses (hereinafter collectively referred to as “each of the instant buildings”). The network D, the father of the Defendant, is the ground pipe structure gate on the part of the line 4.1m (C) connected in sequence to each of the points listed in the separate sheet No. 14, 15 among the land listed in the separate sheet No. 1.1.

arrow