(영문) 서울동부지방법원 2016.11.16 2016가합103574
청구이의
Text

1. The plaintiff's claim is dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

Basic Facts

Plaintiff

On August 21, 2007, the company is a corporation established by investment of petty merchants who operated a simple store in Han River Park.

Article 4 (Opening of Business) (1) Business Name: Business name: Business for the installation and operation of the Han River Stand (hereinafter referred to as the “instant business”): 2) Facilities nature. (3) Convenience facilities: The zone subject to the business of Han River.

1. Flood control shall be possible according to the volume of water discharged from the arms and dams in time of natural disasters, such as floods;

2. The project proposer shall present three designs (three designs) for each type of shop (high-speed carp, general carp, and general store).

3. The shop design shall be finally presented to the Seoul Metropolitan Government (Korean Han River Project Headquarters) and first, the potential concessionaire shall design the shop design according to the design adjusted by the Seoul Metropolitan Government (Korean Han River Project Headquarters).

(b) The area to be occupied and used in a store shall be within 200 percent of the building area of the store, the height thereof shall not exceed five meters in vertical category from the place where it is installed, and it shall be proposed to be the first floor;

(5) Method of implementing the project;

1. This project is a public-private partnership project implemented under relevant laws such as the River Act and the Food Sanitation Act.

2. The project operator shall own and operate this project facilities for a certain period after completion of the project, and the ownership of the project facilities shall vest in the Korea River Project Headquarters at the expiration of the contract period.

(7) Project period

1. The period of construction;

2. Scheduled completion and commencement of operation: January 2008;

3. The period of establishment of facility operation right: The defendant conducted a publication for the selection of the Han River Construction and Operation Business Operator(hereinafter “the publication of this case”) on September 17, 2007 under the pretext of maintaining Han River Park Store on September 17, 2007.

The main contents are as follows:

Plaintiff

The Company’s participation in the business of this case in 3.177 billion won in the total project cost of this case by organizing a consortium with the Korea Development Bank Co., Ltd. (hereinafter “Korea Development Bank”).