(영문) 수원지방법원 성남지원 2016.01.11 2015고단367
업무상과실치사등
Text

1. Defendant A shall be punished by imprisonment without prison labor for one year;

2. Defendant B shall be punished by imprisonment without prison labor for one year.

provided, however, that;

Reasons

Punishment of the crime

Ⅰ. The duties of Defendant E, Defendant J, Defendant F, Defendant G, Defendant H, Defendant I, Defendant A, Defendant B, and Defendant C are injured and injured, and those of actual injury and injury.

1. Each act of negligence committed by Defendant E, Defendant J, Defendant F, Defendant G, Defendant H, and Defendant I

A. Defendant E was the chief of K Co., Ltd. (hereinafter “K”) with a private person executing AP construction work located outside of Sungnam-si AP (hereinafter “instant construction work”), Sungnam-si, and one parcel of land (hereinafter “instant construction work”). Defendant E was a field manager in charge of the process management and construction work for three processes, including AP block, AR block, and underground closing.

Defendant

J as a deputy head K, was a process manager who exercises overall control over the process management and construction work for the underground finishing process of all AP block and AR block.

Defendant

F as the representative of L Co., Ltd (hereinafter referred to as “L”) awarded a subcontract for the construction of metal structure (hereinafter referred to as “metallic”) among the instant construction works from K, the F took overall charge of the construction of metal works.

Defendant

G as the representative of M Co., Ltd. (hereinafter referred to as “M”) who has been sub-subcontracted part of metal works from L, the G has overall control over the performance of metal works, and Defendant H was the deputy head in charge of direction and supervision of field figures.

Defendant

I, as an architect belonging to AS (hereinafter referred to as “AS”), was stationed in the construction site of the instant case and was in charge of supervision of A Q block.

B. During the process of the instant construction project, the instant construction project is called as “AV” and AR block as “AW”, respectively, on the site for research support for AU development project of AT Co., Ltd., the main building owner.

As the two blocks are divided and run simultaneously, "general squares" is installed for the purpose of holding assemblies by many people at the middle of the above two blocks, and two buildings with 5 underground floors and 10 underground floors are constructed for each block, and 5 underground floors for each building are installed with 5 underground floors and 2 underground floors from the mechanical room, 4 underground floors, and 3 underground floors from the 1st underground floors.

arrow