(영문) 춘천지방법원 2020.01.14 2019구합52162
건축허가 변경신청 불허가처분 취소
Text

1. The plaintiff's claim is dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

1. Details of the disposition;

A. B (the Plaintiff was established as a capital of KRW 1 million on March 27, 2019, and B was appointed as the Plaintiff’s internal director) on March 16, 2018, on the Defendant, on March 16, 2018, filed an application for a construction permit including the en bloc processing of Class II neighborhood living facilities 4 and 2 affiliated buildings to the Defendant, which is a natural green area (hereinafter “instant site”), and obtained a construction permit from the Defendant on April 25, 2018, with the following content:

(hereinafter referred to as “existing Permission”). Class II neighborhood living facilities (office) of Class 2 neighborhood living facilities (office) of the 133.92 B-Dong ground structure on the E-dong ground of the building consisting of the 1st floor area of each building, the 133.92 residential facilities (office) of the 1st residential building F-dong structure of the 1st residential building, the 1st residential facilities (office) of the 2nd residential facilities (office) of the 1st residential building G-dong structure of the 1st residential building, the 49.50 residential facilities (office) of the 2nd residential facilities (office) of the 1st residential building E-dong structure of the 1st residential building and the 36.00 sub-building structure of the 1st residential building, the 36.00 square meters of the 2nd residential building and the 36.04,7505.484.384.484.384.484.484.38484.484.

B. On June 25, 2019, the Plaintiff filed an application for change of a building permit, including a blanket processing of permission for development activities, with the following content as to the existing permit:

(hereinafter referred to as the “instant application”). The area of structure used by each floor of the building E-dong, 1st ground reinforced concrete structure (general office) of 328.2772, 328.272, residential building 1st ground-to-ground reinforced concrete structure (general office) of the 1st underground floor of the main building F.M., 211.31.3184, main building G1.3184, multi-family housing of 4th ground reinforced concrete structure (general office) of 1st underground floor of the 1st underground floor of the main building, G-dong, 11.3184, 211.31.3184, multi-family housing of 1st underground floor (general office) of the 1st underground floor of