Text
A defendant shall be punished by imprisonment for six months.
However, the execution of the above punishment shall be suspended for one year from the date this judgment becomes final and conclusive.
Reasons
Punishment of the crime
1. On October 4, 201, the Defendant interfered with the performance of official duties, around 16:55, at the main entrance of the construction site in Seopo-si, Seopo-si, the Jeju Coast Guard Group: (a) prevented the Defendant from entering the construction site while controlling access; (b) obstructed the legitimate performance of official duties of Jeju Coast Guard Group 121, the Jeju Coast Guard Group, which manages the situation of assembly and demonstration, by putting the parts of the buckbucks of the upper D (24 years old); and (c) putting the bucks of the upper D (24 years old); and (d) taking the bucks of the upper D (121 years old), at the same time, at the time
2. On October 6, 2011, around 14:38, 201, at the main entrance at the site of the Seopo-si C&C construction site on October 6, 2011, the vehicles with ready-mixed vehicles, such as E ready-mixed F, were working at the construction site to load and unload concrete mixturess and attempt to leave the site, and on-site security guards G (49 years of age) were performing control duties, such as access vehicles.
At this time, the Defendant called the naval base business team leader and prevented him from entering the said G, “I am feas, Mague,” and obstructed the said G’s access control duties by force between about 15 minutes by pushing the body part of the said G with hand and body.
3. On January 30, 2012, around 17:50 on the main entrance at the construction site at Seogpo City, Seopo-si, Seopo-si, 2012. On January 30, 2012, H ready-mixeds belonging to the Hanpo-si, a supplier company of Hanpo-si, intended to carry concrete mixturess and enter the construction site at the construction site. However, on the ground that Bopo-si will cause the YM, the members of the I and the opposite organization, who are members of the Hanpo-si, were unable to enter the construction site.
For this reason, the above construction vehicles were in progress in front of the entrance of the project team in order to enter the construction site via the entrance of the naval base project team instead of the main entrance. In this case, the defendant, as long as the vehicle is unable to drive by blocking the front of the above construction vehicle, shall enter the bottom of approximately 17 minutes.