Text
1. Defendant B Co., Ltd.: (a) KRW 209,187,632 to the Plaintiff and 5% per annum from June 30, 2015 to August 30, 2016.
Reasons
1. Basic facts
A. The Plaintiff is a corporation that engages in the business of manufacturing semiconductor equipment parts in the building of a reinforced concrete sloping roof structure (hereinafter “Plaintiff factory”) in Gwangju City D-si.
피고 B 주식회사(이하 ‘피고 B’라 한다)는 원고 공장에 인접한 광주시 E 공장용지 지상 철골조 샌드위치판넬즙 공장건물 2동(이하 ‘이 사건 공장’이라 한다) 및 창고 1동을 임차하여 스폰지 제조업 및 스폰지 임가공업을 영위하는 법인이고, 피고 C은 이 사건 공장의 소유자로서 피고 B에게 이 사건 공장을 임대한 사람이다.
B. On June 30, 2015, around 19:54, a fire occurred in the instant factory, and the instant factory was removed, which led to the burning of some of the Plaintiff’s factories and setting fire to machinery, raw materials, etc. inside the said factory.
(hereinafter “instant fire”). C.
As a result of the fire site investigation conducted in the fire station, it is presumed that the fire was first launched by the unexplosive fire source in the vicinity of the raw material distribution unit within the manufacturing workplace among the factory of this case, but it was concluded that the fire was a cause unexplosive fire that was not discovered in the middle of the mixing season.
[Ground of Recognition: Facts without dispute, entry of Gap evidence Nos. 1, 2, 7, and 8, the fact inquiry results of the fact inquiry into the Gwangju chief of Gwangju Construction Department of this Court, the purport of all pleadings]
2. The plaintiff's primary assertion is that the defendants' mutual negligence competes with each other, and the fire of this case occurred and burning, so the defendants are liable to compensate for the plaintiff's damage as joint tortfeasor.
Preliminaryly, the fire of this case occurred due to the defect in the construction or preservation of the factory of this case, which is a structure, and the defendants are liable for damages to the plaintiff as the possessor or owner of the factory of this case.
Furthermore, the damages suffered by the Plaintiff due to the instant fire = KRW 292,249,740.