logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 대전지방법원천안지원 2017.10.27 2016가단114947
시설물철거 및 토지인도 등
Text

1. The defendant shall be the plaintiff.

A. An appraisal in the attached Form No. 28, 1, 2, 3, 4, 5, 35, 32, 31, 30, 29, 29, 28, 28, 20, 200 square meters in the attached Form No. 836.

Reasons

1. Facts of recognition;

A. B land prior to the division is about 1,145 square meters in the area on which the Defendant alleged to be the land B and the land B around April 24, 1997 is about 838 square meters in Asan-si (hereinafter “instant land”) and 1,145 square meters in the area on which the Defendant alleged to be the land.

Around that time, C was divided into a D apartment access road, and land category was changed to a road.

(hereinafter referred to as "the road of this case". (b)

After the division, the instant land remains in the form of a sloping road abutting on the road side of this case by perfect slope, and the Plaintiff completed the registration of ownership transfer on September 3, 2002 due to sale and purchase.

C. The defendant's opening date of a return around 2000 is not clear.

After the completion of part of the land in this case, the sewage pipes (D600m) were laid underground on the 23m23m2, which connects each point of the attached Table 36, 37, 38, 39, and 36 with the attached Table Nos. 36, 37, 38, 39, and 36, and the sewage pipes (D60m2) were laid underground around around 2016, the attached Table Nos. 24, 25, 26, 5, 27, and 24 were laid underground on the part of the ship (c) part of the attached Table No. 8m2, which connects each point.

At present, the portion of the attached sheet No. 28, 1, 2, 3, 4, 5, 35, 32, 31, 30, 29, and 28, which connects each point of the attached sheet No. 28, 1, 2, 3, 4, 5, 35, 32, 30, 29, are packed with concrete and asphalt and used for the general public

Water coming from sewage pipes buried in the section of the port as stated in the same paragraph, is being flown in accordance with the part (f) on the ship (f) which connects each point of 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 53, 54, 55, and 40 square meters in sequence.

(hereinafter referred to as "the appraisal" means the following facts: (a) there is no dispute over each part of the attached sheet; (b) [the basis for recognition]; (c) evidence Nos. 1; (b) evidence Nos. 2, 6, and 8; and (c) evidence Nos. 1, 2, and 5 (including those with serial numbers; hereinafter the same shall apply); and (c) the result of the on-site verification conducted by this Court for the President of the Asia-gu District of the Korea Land and Infrastructure Information Corporation; and (d) the result of the request for measurement

arrow