logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 서울서부지방법원 2015.08.27 2014가합32830
손해배상(기)
Text

1. All plaintiffs' lawsuits are dismissed.

2. The costs of lawsuit are assessed against the plaintiffs.

Reasons

1. Basic facts

A. The Plaintiffs are companies with headquarters in Korea aimed at international complex transport arrangement business and marine transport agency business.

The Defendant is a company with its head office in Singapore for the purpose of marine transportation and operates the instant vessel as the owner of the cargo coting GN011 (hereinafter “instant vessel”).

B. 1) Plaintiff A&C Co., Ltd. (hereinafter “Plaintiff A&C”)

(2) A) from the Shobybybya Co., Ltd., the carrier was requested to transfer the 6st and second 5st and second 5st and second studs from the Incheon port to theme (Tema) of the Incheon port of the Republic of Korea to the consignee Non-Savi Mos. In addition, the Plaintiff A&C was requested to transport the sea by transporting the 6th and second 5st and second st and second sthands from the Ena to the Ena port of the Republic of Korea to the consignee B. In addition, the consignee is requested to transport the sea by changing the delivery of the 5th and second st and second st parts to the ENT from the Incheon port of Korea.

3) In order to implement each of the above maritime shipping contracts, Plaintiff ACW issued a bill of lading (Evidence 2-1, 2) to the Defendant, as the above 1) and 2, to transport each of the cargo requested to be transported, as the above 1) and 1) from Incheon port of Korea, to the consignee, the consignee, through the ocean-going port of Ghana, and to deliver the cargo to the consignee, and on January 2, 2014, each bill of lading (Evidence 2-1, 2) was issued to the Defendant to the effect that each of the cargo was taken over from the Defendant and loaded the cargo to the instant vessel. On the same day, Plaintiff ACW issued the bill of lading to Plaintiff AB PP Co., Ltd and EB PP P P P P P P with respect to each of the above cargo. C. Plaintiff New DP Ltd (hereinafter “Plaintiff New D PP”) from the consignee and the consignee from the 4) from the Republic of Korea to the Republic of Korea.

arrow