(영문) 춘천지방법원 2018.08.28 2017구합334
위반건축물 시정 명령 취소
Text

1. Of the instant lawsuit, the part of the claim for revocation of the corrective order with respect to “1.32 square meters of balcony (1.32 square meters)” among the instant lawsuit shall be dismissed.

2...

Reasons

Details of the disposition

On August 16, 2005, the Plaintiff completed the registration of transfer of ownership with respect to the housing of two floors of Alkylbro and Cho Jongbro-do in the original city B due to the sale of the goods by voluntary auction (hereinafter “instant building”).

The present status of the instant building is as follows.

The Defendant: (a) received a request from the Hanju Police Station to cooperate in an investigation on June 19, 2015 to verify the violation of the Building Act on the part of the building in question; (b) on the part of the Plaintiff, on March 27, 2017, an on-site investigation was conducted to verify the violation of the Building Act; and (c) on the part of the instant building, the Plaintiff violated the Building Act (hereinafter referred to as the “instant corrective order”) to correct the violation of the Building Act by no later than May 27, 2017, with the purport of correcting the part of the building Act, 1st, 1st, 1st, 1st, 1st, 1st, 204 square meters, 1st, 1st, 204.42 square meters, and 1st,3rd, 2007.

The extension of a violation subject to a disposition and extension of an area in violation of Article 11 and Article 110 of the Building Act of the Act on the Punishment of Purpose of Use: 101.19 square meters: The purpose of use of a 87.87 square meters structure of multi-story buildings, such as light fluorries and steel-frames: The second floor area above 87.87 square meters on June 19, 2015 on the date of confirmation of the second floor area above 2015 [Status of Violation] structural activities for the area of a violation subject to a disposition [number of the building] on June 19, 2015]; (1) The increase in building area in the construction area of a sand site in the first floor water tank 0.4 house 0.4 house for the first floor water tank 0.32 house of the first floor; (3) the increase in the building area of a large-scale steel-frame building in the second floor to 87.87 use of the second floor.07.

Of the instant lawsuit, the legality of the part of the claim for revocation of the corrective order with respect to “B-1st floor balcony (1.32 square meters)” among the instant lawsuit is enforced.