Text
1. The Defendant’s KRW 92,606,002 as well as 5% per annum from December 20, 2016 to July 19, 2017 to the Plaintiff.
Reasons
1. Facts of recognition;
A. (1) The Defendant (mutual name B) on October 23, 2014 (hereinafter “C”) shall be the Defendant Co., Ltd. (hereinafter “C”).
B) The Defendant concluded a lease agreement with C to set the period from November 10, 2014 to November 10, 2016, the deposit amount of KRW 60 million, and monthly rent of KRW 6.5 million.2) The Defendant manufactured “FRP for the prevention of pollution (FRP)” within the aforementioned factory.
3) On August 27, 2016, around 22:05, the foregoing factory Adong (hereinafter “instant factory”).
) A fire was caused at a place where the left-hand toilets worked on the left-hand side, and the building A was removed on the entire factory by means of walls, roof, etc. (hereinafter “instant fire”).
4) The instant plant was newly built on June 2014, and the instant plant is the sandd position plate, the ceiling, and the walls in the steel structure.
There is no special fire-prevention facility in addition to fire-fighting equipment inside the factory.
B. (1) As a result of the investigation on the details of the occurrence of a fire, the person related to the Defendant Company completed the work around 17:00 on August 27, 2016 and set off the factory entrance and windows of the instant plant after blocking all of them. (2) On the inside CCTV on the same day, it was recorded around 22:05 on the same day to cut down the flashing light on the left side of the instant factory.
On the same day, at around 22:27, the outside person reported the fire to 119, and the fire engine dispatched to the factory of this case at around 22:34, the fire was first extinguishment around 23:06, and the fire was completed at around 23:45.
3 In light of the circumstances where FRP manufacturing is carried out on the left side of the plant of this case, there is a strong degree of carboning in the lower part, such as a shot, etc. accumulated near the left side of the plant of this case, and in light of the circumstances where the work of manufacturing FRP is carried out on the adjacent floor of the site where the work is accumulated, the fire, etc. occurred in manufacturing the FRP is far away from saw, dust dust, etc. between the work bed.