Text
1. The Defendant (Counterclaim Plaintiff) against the Plaintiff (Counterclaim Defendant)
A. (1) Of the lands listed in the [Attachment 1] list, the annexed drawings (1) are as follows.
Reasons
1. Basic facts
A. On July 17, 2012, U.S. Construction Co., Ltd. (hereinafter “U.S. Construction”) completed the registration of ownership transfer on each land listed in the [Attachment 1] Nos. 1 and 2 (hereinafter “instant land”) which was owned by Gyeongdong Construction Co., Ltd. (hereinafter “U.S. Construction”), and on the third land owned by Busan Metropolitan City on December 10, 2012.
B. Afterward construction, on December 11, 2012, the Plaintiff completed the registration of ownership transfer based on the trust on each of the above lands on the same day.
C. The Defendant (Counterclaim Plaintiff; hereinafter “Defendant”) owned the portion of 35 square meters in the ship which connects each point of 10,11,12,16, and 10 indicated in the attached Form No. 1 among the land in the instant case (hereinafter “instant land”) and the portion of 9 square meters in the ship which connects each point of 18,19,20,21,22, and 18 among the land No. 2 in the instant land (hereinafter “instant land”) and 20,21,23,24, 25, 39, 38, and 20 square meters in sequence among the land No. 1 in the instant case (hereinafter “instant land”), and the portion of the instant land connected with each of the instant land No. 2 in sequence with the land No. 18, 19, 20, 200, 31, 39, 39, 20, and 35 square meters in sequence (hereinafter “the instant land”).
[Ground of recognition] Facts without dispute, Gap evidence 1, Gap evidence 2-1 through 3, Gap evidence 4, and 6-1, 2, Gap evidence 7-1, Gap evidence 8-1, 2, Gap evidence 11-4, Eul evidence 3-1 through 6, respectively;