(영문) 창원지방법원통영지원 2011.09.22 2010가합1711
채무부존재확인
Text

1. The plaintiff (Counterclaim defendant) based on the guarantee insurance contract stated in the attached Form between the plaintiff (Counterclaim defendant) and the defendant (Counterclaim plaintiff).

Reasons

1. Facts of recognition;

A. The status of the parties is a company with the main purpose of manufacturing, manufacturing, controlling, wholesale, retail, etc. of the special lectures and Stains and the main purpose of which is the manufacturing, manufacturing, etc. of the iron manufacturing industry (hereinafter “prestigious Industries”), and the company manufacturing, manufacturing, and installing, installing, at the Defendant’s factory. The Plaintiff guaranteed the duty to install, and repair, of the prestigious Industries.

B. On March 20, 2008, in the process of establishing a factory producing shipbuilding blocks, equipment, etc. in the Simsung-gun, Gyeongsung-gun, Chungcheongnam-gun, the Defendant entered into a contract with the Defendant for manufacturing and installing a list with the content that he will manufacture the 16th unit of Gry Cra and Semi-Gant Cra (including value added tax) with the Gry Cra and install the Defendant’s factory using the string industry as the part fitted with the string industry, and the specific content is as follows:

(A) No. 1, 200,000 won was reduced to KRW 6.325 billion. (3) The payment period of the subject matter of the contract under Article 1: (1) the period of the contract is the period including the installation, trial operation, and the inspection completion of the Industrial Safety Management Corporation (hereinafter “instant installation contract”). The payment period of the items other than the first supply portion shall be the period including the installation, the payment period: (1) the down payment amount: 20% - the intermediate payment amount: 140% - the intermediate payment amount: (2) the intermediate payment amount after the contract, and the intermediate payment amount: 30% after the establishment site; (3) the intermediate payment amount: within one week after the completion of the contract; and (4) the remainder of the contract amount within 12% after the completion of the contract; and (4) the remainder of the contract amount within 10% after the completion of the contract.

The life-long industry is all the contents of the contract.