Text
1. The defendant's appeal is dismissed.
2. The part arising between the Plaintiff and the Defendant out of the total litigation cost is the Defendant.
Reasons
1. Detailed construction of disposal: A power plant, structure of general steel structure, number of floors: A building site area of 4 stories above ground, and 3,194§³: A purification tank of 3,194§³: A sewage pipe D = 150 meters wide, excellent pipes D = For the purpose of constructing a structure of 300 meters wide: stack, structure: 30 meters in height, 5.32 meters in length 】 5.43 meters in size, 28.89 meters in size;
A. On August 26, 2011, the Plaintiff obtained a construction permit (hereinafter “instant construction permit”) from the Defendant on the ground of the Daejeon Seo-dong and 140-42 and two parcels (hereinafter “instant application site”) as follows.
B. On August 31, 201, the Plaintiff obtained permission for the installation of air emission facilities from the Defendant for a power plant as indicated in “A” that is scheduled to be constructed at the instant application site (hereinafter “instant power plant”).
C. However, on February 13, 2012, the Defendant issued a disposition revoking the instant construction permit (hereinafter “instant disposition”) on the grounds delineated below.
(1) The Defendant on the ground of the first ground is notified by the Deliberative Committee on Deliberation on Interpretation of the Ministry of Government Legislation (No. 22, 201) of the result of deliberation that no fuel cannot be used within the Taeduk Special Research and Development Zone (RPF solid fuels).
(2) On the 4,000 residents opposing the moving-out opposition to the power generation facilities and the commencement of construction due to concerns over the environmental damage caused by the second cause, submit a collective civil petition on several occasions.
Although the defendant urged the plaintiff to communicate with the consent of the residents, the plaintiff could not understand and understand all the residents, such as talking about the basic matters without the consent of the residents. Therefore, it is expected that it is difficult to implement the project for the power generation facilities in such a situation.
In particular, at the time of commencement of construction, there is concern about accidents caused by extreme conflicts between the residents and the building owner, and the construction is considered to be practically difficult.
(3) A special research and development zone and a 10-meter road shall be applied for in this case for reasons of paragraph (3).