logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 춘천지방법원영월지원 2015.01.29 2013가합1008
손해배상(기)
Text

1. The plaintiff's claim is dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

.A facility that carries in feed (in-house/ external feed transfer equipment), mooring transport equipment (in-depth and light-water transport container), mooring transport equipment (in-depth transport equipment), ventilation equipment (in-depth transport equipment up to the kitchen), ventilation equipment (in-depth transport equipment), second floor hallways (in-house ventilation equipment).

5. (A) The Defendant delivered the goods from September 1, 2012, and the Plaintiff prepared to deliver the goods from the said period (such as buildings and electric power distribution boards, electric power lines, indoor and outside works, feed beam lines, water tanks, etc.). Even if construction works are delayed due to a failure in preparation, the payment of the goods shall not be postponed, and the liability of the Plaintiff shall be borne by the Plaintiff.

Provided, That if there are special circumstances that delay the date of delivery or receipt, a reasonable date may be extended through mutual consultation.

6.The limits of the installation of cases shall be attached to this Agreement.

* The limits of the installation of cases (if there is no separate contract, the following matters shall not be included in the supply scope of the defendant) and the scope of installation: All steel structures and covers necessary for the installation of the rink facilities, various civil engineering works, and power distribution plates inside and outside the valleys (outboards-outboards-outboards-outboards-outboards-outboards-outboards-outboards-out), roof cutting and cutting-outs for the installation of a ceiling fences, flood control, wind-proof, wind-proof works, etc., structures and heat-proofs, waterproof, wind-proof, wind-proof construction works, side ventilation and cutting and cutting-outs for the installation of ventilation tubes, flood control, wind-proof, air-proof facilities, whole facilities for the installation of the rinks from around 1201 to the disposal room, and all steel structures and cover construction works, mooring facilities, lighting facilities and related structures, etc. to be installed from around 201 to the disposal room.

arrow