(영문) 부산지방법원 동부지원 2014.09.24 2014고단1270
사기
Text

Defendant shall be punished by a fine of KRW 15,000,000.

When the defendant does not pay the above fine, 100,000 won.

Reasons

Punishment of the crime

D Co., Ltd. (hereinafter “D”) is an enterprise mainly engaged in the manufacture and sales of the flow measuring system in E at the time of strike, and the Defendant was in charge of design work in D for about one year from October 11, 199 to November 22, 2008, and was in charge of quality assurance and quality control related to the supply of nuclear power plants for about eight years as a quality assurance worker or a deputy head, and is currently in charge of quality assurance and quality control related to the supply of nuclear power plants.

Around September 28, 2006, Korea TM contract with D to receive supply price of KRW 1,153,214,000 (contract number: H), etc. on the basis of the Korea TM contract with D on September 28, 2006, when necessary, the said contract was in the form of supply order at that time.

According to the purchase contract of Korea-U.S., since the safety of nuclear power plants is affected by the purchase contract of Korea-U.S., the quality grade of Korea-U.S. is required to submit documents verifying the quality of the supplier when the goods are supplied to each item designated as the safety grade, and the contents of the contract must be part of the contract.

D Therefore, when the above goods are supplied, it is necessary to request the quality verification company and the agency to perform quality certification duties such as various tests, and submit only the actual quality certificate issued to Hanwon.

On April 23, 2007, Hanwon ordered D to supply materials production instructions (M) to D on October 31, 2007, using the total supply amount of KRW 128,84,00 (excluding value added taxes) for the production of 6 original flicks (materials Code I~J) and 2 original flicks (materials Code K-L).

The defendant, at the time of October 2007, issued a test report on materials of original skins with the lapse of the payment period due to the delay of the order of the original raw materials, etc., which should be supplied to Hanwon as at the time of payment.