(영문) 의정부지방법원 2015.12.18 2015고단2264
업무상과실치사
Text

The defendant is not guilty. The summary of the judgment against the defendant shall be published.

Reasons

1. The summary of the facts charged is the Vice Minister of Construction and Transportation of F Co., Ltd. (hereinafter “F”) who ordered construction works for the development of the two-way new city development project and the construction works for the construction of roads E from the Korea Land and Housing Corporation, and the Defendant is the person in charge of the third-stage construction site of the said construction works located in both weeks in both weeks (hereinafter “instant construction site”).

The construction site of this case is a section where dump truck was laid down for the opening of a road and the site for dump truck was cut down with the dump truck and the unclaimed part of the site was cut down with soil. At the construction site of this case at the time of November 14, 2014, the dump truck, other than dump truck, was stopped by the hump driver who requested the suspension work on the part of the defendant's side, and the dump truck driver was assigned a dump truck to dump truck driver at the work site, so the manager at the work site of the dump truck and sump truck was at the location of the dump truck to stop or, in consideration of the ground situation, such as the height of the ground and the dump truck, and the traffic accident, such as dump truck and the decline direction of the dump truck and the dump truck, etc. where people are placed with a dump or dump truck, etc.

Nevertheless, the Defendant, at the construction site of this case on November 14, 2014, failed to perform the above duty of care and drive a dump truck with an I 25.5 tons of dump truck.