(영문) 수원지방법원 2016.04.28 2013가합29182
손해배상(기)
Text

1. As to KRW 1,729,943,260 among the Plaintiff and KRW 1,714,943,260 among the Plaintiff, the Defendant shall pay to the Plaintiff KRW 1,714,943,260 from August 29, 2013 to September 30, 2015.

Reasons

(a).(a).

On May 24, 2012, the Defendant concluded a gold production contract (hereinafter “instant gold contract”) with the Plaintiff to produce and supply 33 gold-types constituting food waste collection equipment (hereinafter “instant gold-type”) with the Plaintiff up to October 10, 2012, with the term of KRW 1,062,00,000 (including working expenses for making the surface of the part of the part of the part of the part of the part of the case to the Tollllllllll, including value added tax), and signed a gold production contract (hereinafter “instant contract”) containing the following contents.

Article 2 (Name of Contract)

1. Item 1,00,000 non-aspact-type 33-type 1,000,000,000 additional food waste collection equipment for non-aspact-type 33-type 1,00,000-type 62,000,000 DKN200,000,000 separate sheet-type 1,062,00,000-type 5AT attached Table 3 (Settlement Method);

1. Cash settlement (VAT Map 1) down payment (40%) 400,000,000 won * The first advance payment of down payment 100,000,000 won: by May 25, 2012: * The remainder of down payment 300,000,000 won shall be paid until July 10, 2012. 2) The intermediate payment (462,00,000,000 won shall be paid until July 10, 2012.

3) Any balance (20%) 200,000,000 won shall be paid within 10 days after the approval of the product. Article 4 (Terms of Contracts)

1. The Defendant is fully responsible for technical production issues, etc. in accordance with the sample or drawing and specifications presented by the Plaintiff and the specifications. 2) The Defendant, upon the Plaintiff’s request, shall submit the drawing drawing based on the drawing presented by the Plaintiff to the Plaintiff before the commencement of the work and commence the production after obtaining the Plaintiff’s approval.

3) The Defendant shall report and consult on the problems that occur during the work process to the Plaintiff from time to time. 4) Free A/S shall be one year.

2. In principle, the defendant shall accept the correction of the punishment when the functions and assembly problems of the plaintiff's product of gold correction occur.

Provided, That the alteration is made after the approval of the product.