(영문) 수원지방법원 2016.01.28 2013가합16667
물품대금
Text

1. The plaintiff's claim is dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

(a).(a).

On May 24, 2012, the Plaintiff concluded a gold production contract (hereinafter “instant gold contract”) with the Defendant to produce and deliver 33 gold-types comprising food waste collection equipment (hereinafter “instant gold-type”) by setting the period of October 10, 2012 up to KRW 1.062 million (including working expenses for making the surface of the part of the part of the part of the part of the case to Tolllll, including value added tax), and by setting the period of delivery as of October 10, 2012, the Plaintiff drafted a contract (hereinafter “instant contract”).

Article 2 (Name of Contract)

1. Item 1,00,000 non-aspact-type 33-type 1,000,000,000 additional food waste collection equipment for non-aspact-type 33-type 1,00,000-type 62,000,000 DKN200,000,000 separate sheet-type 1,062,00,000-type 5AT attached Table 3 (Settlement Method);

1. Cash settlement (VAT Map 1) down payment (40%) 400,000,000 won * The first advance payment of down payment 100,000,000 won: by May 25, 2012: * The remainder of down payment 300,000,000 won shall be paid until July 10, 2012. 2) The intermediate payment (462,00,000,000 won shall be paid until July 10, 2012.

3) Any balance (20%) 200,000,000 won shall be paid within 10 days after the approval of the product. Article 4 (Terms of Contracts)

1. The production method of gold paper 1) The Plaintiff is responsible for technical production issues, etc. under the sample or drawing and specifications presented by the Defendant, and the specifications presented by the Defendant. 2) The Plaintiff shall, upon the Defendant’s request, submit the gold design drawing in accordance with the drawing presented by the Defendant to the Defendant prior to the commencement of the work, and commence the production after obtaining the Defendant’s approval.

3) The Plaintiff shall report to the Defendant on and consult from time to time on the problems arising during the work process. 4) Free A/S shall be one year.

2. In principle, the Plaintiff shall accept the correction of the gold punishment when the Defendant’s product function and assembly problems arise.

Provided, That the alteration is made after the approval of the product.